The hallmark of CWAL is excellent service delivery. This is executed in all of our projects handled from inception till date. Here are some previous and current projects executed.

  • 1990-1993

    Cledop was awarded contract to supply Shell with Drilling Fluids.

  • 1994-1996

    Awarded contract by NAPIMS to provide quality check and drilling fluids

  • 1999–2001

    Awarded contract by Mobil to supply drilling fluids

  • 2002–2011

    Awarded contract by Exxon Mobil for completion services.

  • 2007–2010

    Awarded contract by NPDC for supply of drilling fluids.

  • 2007–2012

    Awarded contract by Shell to supply Barite/Bentonite.

  • 2008-2013

    Awarded contract by Mobil for filtration services

  • 2010-2012

    Awarded contract by SINOPEC for drilling fluids, filtration and solid control services.

  • 2014

    Rentals & Maintenance of Solid Control Equipment Including Manpower Supply for Sterling Global Limited

Other Projects

Full Drilling Fluids services have been provided to the following operators:

NPDC

  • Oredo 10, Oredo 12, Oredo 8B
  • NPDC/SIPEC JV – Kukaku-1, Kukakuye-1, Kukaku-2, Kanuskiri-Bis
SAHARA ENERGY

  • MART ENERGY
  • WALTER SMITH PETROMAN,
  • HILONG-SPDC,
  • JEMMTEK-NPDC,
  • STERLING GLOBAL
EXXON MOBIL

  • Providing completion and work-over fluids operations for more than a decade with excellent results, leading to the development of a non-damaging completion and work-over fluid pills, the CWAL Salt Pill and Salt Seal, for Exxon Mobil field operations.
  • Provision of Brine Filtration and Engineering Services
  • Completion of Workover Fluids / Engineering Services (2002 to Date)
NPDC and NESTOIL

  • Provision of drilling fluids/Engineering service, Solids Control, Workover, Completion, mobile mud plant for the storage and handling facilities for drilling fluids.
  • Successfully tested a couple of wells for NPDC/SIPEC JV operations using completion fluids
SINCOPEC/NPDC OML 64/66

  • Provision of Cledop’s integrated services including drilling fluids, Solids Control, Workover, Completion, mobile mud plant for the storage of oil base mud and weighting agents on barges at rig sites with Engineering Services (2007 to Date)
SPDC

  • Supply of drilling fluids weighting agents (2002 to 2008)
  • Supply of Barite and Bentonite (1991)
Federal Government of Nigeria

  • Supply of drilling chemicals and quality controls checks for at Maiduguri, DES/FES (2005)